Complete Project

Construction of 5-storied 100 Beded Boys Hostel with 5-storied foundation in/c. Sanitary, Water Supply and Electrification Works at Joynogor Bazar Hazi Goni Box High School, Sadar, Sunamganj

Construction of 5-storied 100 Beded Girls Hostel with 5-storied foundation in/c. Sanitary, Water Supply and Electrification Works at Islamganj College, Sadar, Sunamganj (EED-Sunamganj)

Construction of 5-storied Multipurpose Building (Boys & Girls) with 5-storied foundation including Sanitary Water Supply and Electrification Works at Islamganj College, Sadar, Sunamganj. (EED-Sunamganj)

Construction of Boundary Wall With Gate (With Retaining Wall) at Islamganj Degree College, Sadar, Sunamganj. (EED-Sunamganj)

Protective work along the Right Bank of Kushiyara River from km 44.400 to km 44.750 total 350m at Fesi-bazar in Asarkandi union of Upazila-Jagannathpur of District-Sunamganj under Sunamganj O&M Division-2, BWDB, Sunamganj .

Protective work along the Right Bank of Kushiyara River from km 51.660 to km 51.990 total 330m at Bhangabari in Pailgaon union of Upazila-Jagannathpur of District- Sunamganj under Sunamganj O&M Division-2, BWDB, Sunamganj.

Protective work along the Right Bank of Kushiyara River from km 51.990 to km 52.290 total 300m at Bhangabari in Pailgaon union o fUpazila-Jagannathpur of District- Sunamganj under Sunamganj O&M Division-2, BWDB, Sunamganj.

Construction of 10 Storied Residential Tower with 10 Storied Foundation -Jatiya Kabi Kazi Nazrul Islam University, Trishal, Mymensingh.

175m Bridge, Sunamganj (LGED)

Mohila Etimkhana , Mohanganj-Netrokona

Construction Of 5 Storied 100 Beded Girls Hostel Building With 5 Storied Foundation Including Sanitary Water Supply And Electrification Works At Madan Shohid Sharanika Pilot Girls High School Under Madan Upozila Netrokona District.

Shailajaranjan Cultural Centre

TSC Durgapur

Development of road by RCC starting from Boira Shamsunnahars House to G.M's house. R-1279: Development of road by RCC starting from Boira Pagla bazar Nipen's house to Himangshu BikashSorkar' shouseR-1280: Development of road by RCC starting from Pagla bazar Malek shop to Nuru mia house

D-1392: Construction of RCC drain with slab starting from Digerkanda Sadir house to Fakir house (Length=304m) D-1394: Construction of RCC drain with slab starting from Abdul Aziz house to Nabu house via Bagher mour(Length=980m)D-1397 :Construction of RCC drain starting from Digerkanda Moti sahebhouse todeep tubewell (Length=135m)R-1272: (a)Constructionof RCCroadstarting fromBoiraSolimhouse toPaglaBazar inwardno-24.(Part A=100m,Part-B=30m, Part-C=1520m, Total length=1520m) (b) Constructionof RCCpalisadingR-1273:ConstructionofRCCroadstartingfromBoiraAnuhouse to Mouazzem saheb house in ward no-24. (Part-A=430m,Part-B=60m,Part C=100m,Part-D=150m,Part-E=180m;Total=920m)R-1274:Construction of RCC road starting from Boira east .Azad house in ward no-24. (Part-A=120m,Part-B=40m,Part-C=20m; Total=180m) R 1275:Construction of RCC road tarting from Boira Supari Bagan Mannan sorkar house to Bil par inward no-24. (Part-A=550m,Part-B=30m,Part-C=50m,Part D=120m,Part-E=50m;Total=800m)R-1277:ConstructionofBCroadstartingfrom BoiraUkil Bari mour to Somadhan road inward no-24. (Part-A=420m,Part B=240m,Part-C=80m; Total=740m

Construction of RCC drain starting from Bolashpur Nabu house to Akmal house.(Total Length=1230m)D-1006:Construction of RCC Drain starting from TopBabamazar to Dipjol house in ward no-19(L=100m)D-1007:Constructionof RCC drain Starting from Boashpur Gias Uddin saheb house to Advocate Saiful Islam house inward no-19.(Total=275m) D-1008: Construction of RCCdrain StartingfromBolashpurAdvocateGolaphousetoKarimSahebhouseinwardno 19(L=105m)D-1009:ConstructionofRCCdrainStartingfromVatikashor infrontof Zia house to away of Goni mia house inward no-19.(Total=675m) D-1010: Construction of RCC drain starting from Bolashpur main road to Mr.Aziz house in ward no-19.(Total=246m) D-1011: Construction of RCC drain starting from PalparaMr.MossharrofhousetoMondir(Length=150m)D-1012:Constructionof RCCdrainStartingfromVatikashorMainroadtoSoforMemberhouseinwardno 19(Total L=180m)D-1014:Construction of RCC Drain starting fromVatikashor Amir Saheb house toNazimUddin house inward no-19.(L=100m) D-1015: Construction of RCC drain starting from Bolashpur Moddhopara main road to Shawpon house inward no-19.(L=100m) D-1017: Construction of RCC drain starting from Palpara Mondir to Kashi house with bylane drain (Total Length=1815m) D-1018:Construction of RCC Drain at Bolashpur starting from Jobbar morol house to Kashem house in ward no-19.(L=70m)

Rehabilitation of Mitha moin UZ HQ to Katkhal GC Road from Ch: 12168.4 16000m by RCC (Road ID No. : 348592001) under Mithamoin Upazila,District: Kishoreganj.

Construction/Reconstruction of Hygienic Slaughter slab/wet market at Upazila level

Constructionof 05-Storied ultipurpose Building (Boys&Girls )With 05-Storied Foundation in/c. Sanitary, Water Supply and Electrification Works at Moazzempur High School, Tahirpur, Sunamganj.

Construction Of 5 Storied 100 Beded Girls Hostel Building With 5 Storied Foundation Including Sanitary Water Supply And Electrification Works At Madan Shohid Sharanika Pilot Girls High School Under Madan Upozila Netrokona District.

Improvement of Taligati GC-Avoypassa Bazar via Diara bazar Road at Ch. 2000 7480m, Under Atpara Upazila, District: Netrokona [Road ID No 372043005].(Salvage cost Tk. 12,50,811.00)

Construction of 50.00m long RCC Girder Bridge on Nazirpur GC- Fakirer Bazar GC(Kalmakanda Part) Road at Ch. 10980m (Road ID-372402006) under Upazila: Kalmakanda, Dist: Netrokona.

Vertical Extension of 3rd floor (Civil, sanitary, Internal Electrification, External Electrification & Supplying of furniture) works at District NSI Bhaban, Netrokona

Construction of R.C.C Boundary Wall (With Retaining Wall) With Gate at Moazzempur High School, Tahirpur, Sunamganj.

Improvement of road by BC from Sreerampur-Joypur Road at Ch. 2260-3895m Under Mohanganj Upazila, District: Netrokona [Road ID No-372634001]

Construction of Ghosber Joyramkura High School & College Flood Shelter under Mymensing District Haluaghat Upazila.

Construction of Horizontal Toilet block & Vertical Extension of Existing Academic Building 1st floor & 2nd floor in/c. Sanitary Water supply & Electrification Works at Laourgar Adarsha High School, Tahirpur, Sunamganj.

Construction Of Single Storied Academic Building With 4-Storied Foundation With Pre Cast Pile Including Sanitary, Water Supply & Electrification Works At Charpara Mohadebpur High School Under Sadar Upazila Netrokona District.

Vertical Extension Of Existing Academic Building Including Sanitary, Water Supply & Electrification Works At Mawlana Muhamad Ali Siddiki College Under Kendua Upazila Netrokona District.

Construction Of Single Storied Academic Building With 4-Storied Foundation Including Sanitary, Water Supply & Electrification Works At Janata High School Under Kolmakanda Upazila Netrokona District.